Paint production involves multiple stages, including mixing, dispersing, grinding and filling, and also includes flammable materials such as solvents and resins. Therefore, regular incpection and maintenance of the paint production line are crucial. Good maintenance practives not only reduce malfunctions, but also ensure consistent product quality and improve overall factory safety and production efficiency.
The following are key points for daily incpection and maintenance summarized by JCT based on years of experience in felivering paint production line.

Daily Check Focus
1. Electrical system inspection
Check if the explosion-proof motor runs smoothly and without any abnormal noises.
Check if the electrical control cabinet temperature is overheating.
Check if the wiring is loose or damaged.
Confirm that the emergency stop button is sensitive and effective.
Purpose: To avoid safety risks such as electrical sparks, leakage, and machine shutdown.
2. Inspection of mixing and dispersing equipment
Including high speed disperser, reactor, etc:
- whether the blades are worn or bent
- whether the main shaft runs smoothly
- whether there are any adhering substances on the mixing paddle that have not been cleaned in time
Purpose: To ensure stable dispersion efficiency and avoid affecting the fineness and uniformity of the product.
3. Grinding equipment (daily operation)
Check if the chamber temperature is normal.
Observe for ceramic bead blockage or wear.
Check if the sound is normal, with no metallic friction noise.
Check if the flow rate is stable.
4. Piping and valves
Check if the feed pipe is blocked or leaking.
Check if the valve flexibility has deteriorated.
Check for solidified solvent or pigment residue.
5. Feeding system (cleanroom feeding cabinet, etc.)
Check for filter blockage.
Check for aging of sealing strips.
Check for normal dust recovery.
6. Filling system
Check for leaks in the filling gun.
Check for deviations in the weighing system.
Check for solidified residue in the pipeline.
Daily Cleaning Focus
- Clean residue from the surfaces of mixing tanks and dispersion trays.
- Clean up solvent and paint drips from the floor.
- Keep the filling station oil-free and paint-free.
- Clean filters and screens.
- Clean the dust-laden material feeding area and ensure good airflow.
Equipment Maintenance Recommendations
1. Lubrication system
Check bearing lubricating oil weekly.
Replace the grease on the main shaft of the high speed disperser monthly.
Regularly replenish lubricating oil to the high speed disperser and mixing tank.
2. Seal inspection
Check for wear on shaft seals and mechanical seals.
Replace any leaks immediately.
This is especially important for solvent-based paint factories.
3. Filtration system replacement
Replace filter screens, filter cloths, and filter cartridges according to schedule.
Maintain the cleanliness and flowability of the finished product.
4. Electrical system maintenance
Check wiring terminals for looseness monthly.
Test motor temperature rise quarterly.
Inspect the integrity of equipment in explosion-proof areas (especially important in ATEX standard areas).
5. Safety system maintenance
Check fire extinguisher pressure weekly.
Check the ventilation system for proper functioning.
Check explosion-proof lights and switches for damage.

Production Environment Maintenance
- Maintain workshop ventilation
- Control ambient temperature (to prevent excessive solvent evaporation)
- Keep the area dry to prevent moisture damage during water-based paint production
- Regularly monitor VOC levels
Establish and Maintain Archives
| Proejct | Cycle | Record Content |
| Daily inspection | Daily | Electrical, mixing, grinding, valves |
| Cleaning record | Daily | Equipment surfaces, floor, feeding area |
| Lubrication record | Weekly | Main shaft, bearings, reducer |
| Fault record | Real-time | Time of failure, cause and handling |
| Safety inspection | Weekly | Fireextinguishers, ventilation, explosion-proof equipment |
As a manufacturer of paint production line equipment, JCT offer:
- Complete paint production line equipment
- Equipment installation and commissioning
- Operation and maintenance training
- Formula and process technical support
- One-year warranty, lifetime maintenance